|
Methodology
for construction of the structure: |
Slotted angle main framing,
Precision alignment of Main reinforcement
of 8 mm vertical and 4 mm horizontal
bars followed by fixing several
layers of Steel meshes of different
types. |
|
Special
Precautions: |
Anticorrosive treatment with
IPNet RB for all the bars, Galvanized
meshes, and high performance in
situ mortar with microsilica,
superplasticizers, fibers and
polymers |
|
Reason
for precautions: |
Environmental attack, heavy
rainfall in Mumbai, thin elements
etc. |
|
|
|
|